It was only when the design was able to pass strict enterprise-grade Zero Error standard of 400 units surviving 500 hours of the toughest continuous testing without a single errororfailure that the drive was manufactured.
But investigators are focused on a failure of the train tracks themselves, as opposed to an error by engineers or a failure of the train's signal system.