The system must be divided according to pressure capacity of the host equipment , tubes , end facility etc.
系统分区必须根据主机、管道、末端设备等的承压能力划分。
Based on facilities planning and design, the article discusses the factory layout, workshop separation of manufacturing system and relevant workshop building, material transportation facility etc.
基于设施规划设计对制造系统的工厂布置、车间划分以及与之相关的车间建筑、布置、物料输送设备等方面进行了探讨。
Sewage and waste disposal is properly plumbed from the facility and does not provide a potential source of contamination to contact surfaces, products, components, water supplies, etc.
污水与废弃物通过工厂管道正确排放,不能成为接触面,产品,原料与供应水的潜在污染源。
应用推荐