Based on the calculation of annual fixed expenditure and annual running cost, compares some heat and cold source schemes with annual current expenditure method.
用年经常费用法对几种冷热源方案的年固定费用和年运行费用进行了计算比较。
Methods Evaluation was made based on the expenditure survey and the method of health economy analysis.
方法根据湖北省世行项目结核病人控制费用调查表及卫生经济与评价方法。
Numerical results show that the mixed, iterative method promises to add considerable accuracy to displacement-based finite element method results by a small additional expenditure.
数值例题表明,在很少的附加计算工作量下,显著地改善了位移法解的精度。
应用推荐