In a radical experiment which he called "building without foundations", he skipped the concrete substructure and instead built the guest wing on a pre-existing natural rock formation.
The company has said it is mainly interested in mining in areas of rock between existing flooded mine workings, but some of those flooded areas need to be pumped for safety.