While reviewing the performance data presented in the upcoming Part 2 of this paper, please keep in mind that the measurements are based on the total execution time, not throughput.
在分析即将发布的本文的第 2 部分中提供的性能数据时,请记住,这些测量是基于总执行时间而不是吞吐量的。
Pressure measurements could guide the execution of such an energy-saving maneuver.
压力测量数据会引导实施这种节能式操控。
We establish the system of execution and control measurements, such as the evaluation system for the results and balanced scorecard concepts.
围绕目标制定了执行和控制措施,制定绩效考核办法时,引入了平衡记分卡理念。
应用推荐