blasting excavation sequence 爆破开挖程序
optimization of excavation sequence 开挖顺序优化
The excavation sequence is the key to the roadway stability in long-span full coal drift.
大跨度全煤巷道开挖顺序是关系到巷道稳定性的关键。
The fracturing process induced by different excavation sequence under final highwall with auger mining was numerically simulated.
对到界边坡下采用螺旋钻机开采煤柱不同开采顺序引起的破坏过程进行了数值模拟。
The excavation sequence and excavation method of the main carven system affect directly the completion date, quality, safety and cost of the project.
主厂房系统爆破开挖程序和开挖方法,最直接地影响着整个工程工期、质量、安全及成本。
应用推荐