In two-stage estimate, used orthogonal transformation to estimate aggregate average and fitting constants method to estimate variance which was unbiased.
在两步估计法中,利用正交变换得到了总平均的估计,然后采用拟合常数法得到了方差的估计,并证明了该估计是无偏估计。
Suppose the estimated duration of a task is 3 months, and the variance of the estimate is 1 month.
假设估算的任务持续时间是 3 个月,并且估计的方差是 1 个月。
In particular, the team can estimate the three values — lowest, nominal, and highest estimations — assuming that the risk was removed, and then apply these values to reestimate the project variance.
特别地,团队可以估计三个值——最低、标准和最高估计值——交涉去掉了风险,并且应用这些值重新估计项目方差。