Work erosion control 防蚀工程
If you cannot avoid precipitation during construction, or if your landscape budget means the work will have to be done in installments, use temporary erosion control measures.
如果你不能避免在施工期间,降水,或者如果您的预算是指景观的工作将要分期进行,使用临时侵蚀控制措施。
Native plants work well; their very presence proves they're an excellent erosion control tool already adapted to the local environment of soils and slope.
原生植物的工作良好,他们的存在证明了他们是一个很好的侵蚀控制工具已经适应了当地的土壤和环境的斜坡。
应用推荐