Based on fuzzy set theory, a fuzzy design trade off method has been presented in the paper, which supports the philosophy of concurrent engineering.
本文基于模糊集合原理,提出了一个支持并行工程实践的模糊设计折衷方法。
Fuzzy math and the theory of AHP are combined to set a fuzzy overall analysis model, which is used in the engineering project quality risk analyses.
将模糊数学与层次分析方法相结合,建立了模糊层次分析模型并应用于工程项目质量风险分析。
The control scheme adopts fuzzy logic based set-point weighing algorithm to enhance its robustness. The proposed algorithm has the advantages of less computation and easy engineering application.
该方法能有效地提高系统的目标跟随特性、抗干扰性和鲁棒性,并且具有计算量小、工程容易实现的特点。
应用推荐