Three controls are the objective of engineering supervision for Gongboxia hydropower station, of which the quality control is the core work in the engineering supervision.
公伯峡水电站机电安装的监理工作目标是进行三大控制,其中质量控制是监理的核心工作。
The practice of engineering project shows that it is the key of improving performance to choose correct control strategy and control algorithm for gas pressurization station.
工程项目的实践表明,选择正确的控制策略与控制算法是提升煤气加压站技术性能的关键。
And rotary orifice lute could overcome difficulties caused by traditional orifice lute, and has successfully been applied in seepage control engineering of Goupitan Hydropower Station.
旋转式封闭器能解决这一系列问题,并已成功地在构皮滩水电站渗控工程中运用。
应用推荐