The waster treatment technology and specific method of water distribution pipe design were illustrated, so as to guarantee optimal running after engineering completion.
阐述了水处理工艺及配水管道设计的具体方法,以确保工程竣工后良性运行。
Completion of a college or university program in mining technology or engineering may be required for some positions in this group.
采矿技术或工程学院或大学计划完成可能需要在这个组的一些位置。
Project management through the engineering construction to the stages of completion, in the whole process of engineering construction, planning, organizing, directing, coordination and control.
工程管理贯穿于工程施工到竣工的各个阶段,在工程施工的全过程中,进行计划、组织、指挥、协调和控制。
应用推荐