The project system reliability analysis method is adopted. The limit state equation is established. The calculation method of fully mechanized working face support system reliability is pointed out.
并采用工程系统可靠性分析方法,建立了综采工作面支护系统极限状态方程,提出了综采工作面支护系统可靠性的计算方法。
During both of the stages analysis, we got to know the bridge's properties about mechanical and deformation and the different working state exerted in different seismic loads.
在这一系列的分析过程中,了解了高墩连续刚构桥在弹性范围内的受力和变形情况,在弹塑性阶段墩结构在不同地震作用下的工作状态。
Although the indoors experiment model can't imitate the state of destroying in testing ground completely, it is feasible in qualitative analysis of the working mechanism of cement-soil mixing piles.
本室内静载试验模型虽然不能完全模拟现场水泥土搅拌桩的工作状态,但从定性上分析水泥土搅拌桩复合地基的工作机理是可行的。
应用推荐