First of all, the paper USES work Load Point assessment system, work breakdown structure and critical path method to build the control and monitor system based on the work Load Point system.
首先,本文运用工作负荷点系统的评估系统、项目分解结构以及关键路线法构建了基于工作负荷点系统的进度度量监控体系。
The concept, composition and assessing method of the work Load Point system are defined clearly, and the differences between work Load Point system and traditional hour-working system are described.
对工作负荷点系统的概念、构成以及评估等进行了清晰的定义,论述了工作负荷点与传统的工时定额之间的区别。
The system uses the TMPPT mode to make the solar battery work at the most power point, and provides the most energy for the load at the same time.
系统同时采用TMPPT方式使太阳电池尽可能工作在最大功率点处,为负载提供最大的能量。
应用推荐