If you do not have control over the artwork pipeline, this won't work as writing some sort of a converter would take longer than getting a BSP sub-division routine up and running.
如果你没有在艺术品管道控制,这不能作为写作的某种变换器要比BS P分程序和运行时间。
The results show that, compared with the traditional control work zone division approach, applying the suggested approach leads to the enhancement of the road traffic flow efficiency.
结果表明:与传统控制子区划分方法相比,运用该方法可进一步提高道路交通流的运行效率。
应用推荐