Summer sun exposure should be prevented, the winter cold season, the construction insulation measures should be taken.
夏季应防止阳光暴晒,冬季低温季节施工应采取保温措施。
Also on the hot, rainy, winter night, and other special construction techniques and measures introduced.
还分别对炎热、雨季、冬季、夜间等特殊施工的技术措施做了介绍。
Construction response measures under the climates of windy and rainy, high temperature and winter in Hangzhou are described.
作者对杭州的风雨,高温,冬季气候下的施工应对措施进行了论述。
应用推荐