When the engineer found the machine stopped working, he stopped to check what the.
当工程师发现机器停止工作,他停下来查看出了什么错。
When the Engineer instructs for trimming to improve the appearance, the consequential cost shall be borne by the Contractor.
为了获得满意的外观质量,监理工程师认为有必要进行修整时,其费用由承包人负责。
When the engineer performs inspection, it is usually to determine that the structure, as completed, conforms to the plans and specs (specifications).
工程师进行检查时,通常是确定建筑物在竣工时是否符合图纸和施工说明书。
应用推荐