Based on the present situation, characteristics and demands of Eastern Route South to North Water Transfer Project, several principles for selecting pump stations and pump units are put forward.
根据南水北调东线工程的特点、要求和现状,提出工程梯级泵站、机组结构与功能选用原则。
Excellent pump or bilge, live bait tanks, liquid transfer, de-watering, emptying water beds, clogged sinks, tubs, and other small jobs around the house.
优秀泵或舱底,液体转移,脱水,排空水床,沉积物和其他小厂房任务。
Baoying Pump Station was the first-built project in Southto-North Water Transfer Project.
宝应泵站是南水北调东线第一个开工建设的项目,对以后其他泵站的建设起着示范的作用。
应用推荐