The sequence of water supply is that the Power Plant generating and water supply for living is prior, followed by water for industry and irrigation in order.
供水次序为先蓄能电站发电与生活供水,而后依次为工业用水与农业灌溉。
This paper introduces the features of the design and distribution of high pressure water supply pipeline in sub-critical units of Datang Yuncheng Power Plant in Shanxi province.
详细介绍了山西大唐运城发电厂亚临界机组高压给水管道设计及布置的特点。
In the view of insufficiency in water supply of circulation water pumps in ZhuJiang power plant, the circulation water pumps were retrofitted with the aim of increasing flow rate and saving energy.
针对珠江电厂循环水泵供水不足、泵叶片强度不够等问题,对循环水泵进行了增流节能技术改造。
应用推荐