Piped water pressure tests 管道水压力试验
After accomplishment of the construction of cutoff wall, water pressure tests and quality inspection were conducted, and the results indicate that the dam meets the anti-seepage request.
防渗墙施工结束后,进行压水试验和质量检查,满足主坝防渗要求。
In accordance with the mechanism of its reducing water impact pressure, a calculation formula for the gas tank volume is deduced, which is proved to have high accuracy through verification tests.
根据其减缓水击压力的原理,推导了储气罐体积计算公式,通过试验验证,证明该公式具有较高的精度。
Real time monitoring and inspecting are conducted during construction; improving effects are detected through pore water pressure, layer settlements and plate load tests etc.
该工程施工与现场实时监测相结合,利用孔隙水压力、土体分层沉降和载荷试验等检测指标对加固效果进行了监测和检测。
应用推荐