The treatment methods, technology, quality control measures and treatment results for the blocking water with grouting treatment project in a bursting water coal mine of Henan province are introduced.
介绍了河南省某突水煤矿的注浆堵水治理工程的治理方法、工艺及质量控制措施、治理效果。
Through the research of high gas and multi-water-bursting hazards prevention techniques in Jiaozuo coal mine regions, the mining coal method of caving working face is found.
通过对焦作矿区高瓦斯多水害防治技术研究,找出适合该条件下的炮采放顶煤模式的采煤方法。
应用推荐