Using value engineering theory and fuzzy mathematics theory, the paper establishes design change scheme and construction methods change scheme evaluation model.
因此运用价值工程原理和模糊数学原理建立了设计变更方案和施工方案变更方案的技术经济评价模型。
The joining precision of the bridge shows that this theory and method have some reference value about vertical deformation monitoring to other same kind of bridge construction.
该桥较好的合拢精度表明,上述理论和方法可供同类桥型施工监控时参照。
The cost control method based on the value chain theory provides a way to solve the problem in the construction industry.
基于价值链理论的成本控制方法为解决我国建筑企业成本控制问题提供了思路。
应用推荐