·2,447,543篇论文数据,部分数据来源于NoteExpress
There were 20 cracks at upstream face dam head of Huanren dam during construction which threatened dam safety.
桓仁大坝上游面施工期发现严重的劈头缝20条,威胁大坝安全。
The pier arrangement on spillway crest with sloping upstream face is studied by 310 sets of experiments in the paper.
本文通过310组试验,研究了上游面倾斜的溢流坝的闸墩布置。
There are many treatment method for seepage of concrete dam body. Blocking at upstream face and drainage at downstream face is one generally adopted.
混凝土坝体渗水处理目前方法很多,一般采用上堵下排的方法。
应用推荐