For continuity, the walls of the MAXXI were cast on-site in self-compacting concrete, representing one of the most challenging aspects of the construction process - with casts up to 50m long.
对于连续性,墙上的MAXXI投自密实混凝土的现场,代表之一的建设过程中最具挑战性的方面-与铸件可达50米长。
youdao