A two-phase approach is required to process the data (TreeMap containing LocationDTO objects), because the Location data Provider returns a TreeMap sorted by zip code.
需要一个分为两阶段的方法来处理数据(TreeMap中包含LocationDTO对象),由于位置数据提供者会返回按邮编排序的TreeMap。
This paper proposes a practical two-phase approach to substation optimization planning.
提出了一种变电站两阶段优化规划方法。
应用推荐