The project has two substations, in order to achieve the telemetry and remote monitoring system of functional components layer distributed architecture design.
此项目有两个变电所,为达到远测和远信的功能监控系统设计成分层分布式结构。
In order to solve the two problems, the formulation of foam was optimized. The adoption of circularing foam system equipment made foam be used many times but air can be emitted into atmosphere .
为解决以上两个问题,优选了泡沫液配方,采用了循环泡沫系统装备流程,使泡沫基液可循环使用,而空气排放到大气中。
The affecting factors of the continuous-flow two-sludge system for simultaneous biological phosphorus and nitrogen removal were investigated in order to decide on the best working state of the system.
目的为了深入研究连续流双污泥反硝化同时除磷系统的主要影响因素,确定系统最佳运行条件。
应用推荐