Mechanical behavior of lining structure is analyzed under 10 different conditions that high water pressure suddenly effluent water upon 8 different parts of tunnel section with FEM numerical model.
用有限元数值模型,分析隧道断面上8个不同位置10种不同水压突水条件下衬砌结构的受力特征。
Mountain tunnel construction with high water pressure will apply the tunnel boring machine method (TBM) more and more.
长大深埋高水压山岭隧道的施工将越来越多地采用隧道掘进机法。
应用推荐