The duration time of the seismomagnetic anomaly distinguished in above methods is no more than 9 months, which is the medium - short term anomaly.
震例分析表明,用上述方法提取的震磁中期异常时间一般不超过9 个月。
There are traditional model methods of forecasting short-term load, such as time series, regression analysis, and so on.
电力系统短期负荷预测使用的方法有传统建模方法,诸如时间序列、回归分析等方法。
An improved method for short term electric load forecasting is presented. It is based on time series methods and fuzzy logic techniques.
提出一种时间序列算法和模糊逻辑技术相结合的电力系统短期负荷预测方法。
应用推荐