The GERT network can solve not only the project time optimization problem in making bridge construction plan, but also the cost optimization in the limit of proper project time and resource.
随机网络不仅可以解决桥梁施工计划的工期优化问题,而且在合理工期和限定资源条件下,可进行施工成本优化。
The analytic model of business process assignment optimization is presented to undertake the trade-off among resource, time, cost constraints and decision nodes in multi-project environment.
建立了折衷考虑资源、时间和成本约束,以及决策节点的多项目环境下的经营过程配置优化解析模型。
In this paper, the author try to use Network Optimization Method to optimize the management of the great-prepares in power plant, so as to shorten time, reduce consumes and balance resource.
本文应用运筹学中的网络优化理论和方法对发电企业设备大修的管理进行优化,以缩短工期、降低消耗、平衡资源。
应用推荐