The GERT network can solve not only the project time optimization problem in making bridge construction plan, but also the cost optimization in the limit of proper project time and resource.
随机网络不仅可以解决桥梁施工计划的工期优化问题,而且在合理工期和限定资源条件下,可进行施工成本优化。
The analytic model of business process assignment optimization is presented to undertake the trade-off among resource, time, cost constraints and decision nodes in multi-project environment.
建立了折衷考虑资源、时间和成本约束,以及决策节点的多项目环境下的经营过程配置优化解析模型。
Resource optimization is a hot spot in the field of the workflow optimization and optimizing the amount of resources can maximize the flow of time so as to improve performance.
资源优化是工作流参数优化领域的热点,优化资源数量可以最大化地改善工作流时间性能。
应用推荐