The choice of the risk measure is related to the economy condition.
至于具体选择哪一种测度,则应视特殊的经济情况而定。
Hope project in follow-up develops and play a role in guiding, consult, Take precautions against, control the risk measure to try hard to realize that project value is maximized.
希望对后续的项目开发能起到指导、参考的作用,采取防范、控制风险措施力图实现项目价值最大化。
When surveyors sight the summit, there is a risk they might not all measure the same point.
当测量员们看到山顶时,他们可能无法测量到同一个点。
应用推荐