Finally gives Lantsang Hydropower Planning centralized control center and design of the overall program.
最终给出澜沧江梯级电站集控中心的整体规划设计方案。
The major equipment, process flow, main parameters, overall design scheme and program design of the production line for sand blast both inside and outside the pipe surface are introduced.
介绍了钢管内外表面喷砂除锈生产线的主要设备、工艺流程及主要参数,电气系统总体方案设计和程序设计。
Including overall program design, mechanical structural design, and design assembly drawings and important parts of the check, motion control card introduction.
其中包括进行总体方案设计、机械结构设计、并设计装配图和重要的零件校核,运动控制卡的介绍。
应用推荐