This method was applied to the optimization of operation plan for high-pressure injection system of an oilfield. A great economic benefit has been gained.
运用该方法对某油田高压注水系统运行方案进行了优化计算,取得了良好的经济效益。
The successful implementation of these measures will promote the optimization of operation of the medium and small hydropower plants connected with the power grid.
这些措施的实施成功,为进一步开展并网中小水电的科学、合理发电调度管理提供了坚实的基础和宝贵的经验。
应用推荐