A fracture dynamics analysis is given to an accident on a gudgeon link of the miter gate of a dam.
对某水坝船闸人字门拉杆断裂事故进行断裂动力学的定性与定量分析。
Combined with the engineering practice of the Dayuandu project, the process of applying prestress on the back tie rods of the miter gate is also described hereinafter.
并结合大源渡工程实践介绍了对人字门背拉杆施加预应力的方法。
The installation of the miter gate for Three Gorges Permanent Lock has the characteristics of big construction difficulty, high installation accuracy requirements and many assembly parts.
三峡永久船闸人字门安装具有施工技术难度大、总装精度要求高、安装部件多而杂等特点。
应用推荐