Especially important is to ensure that the developers did not introduce major design changes without first calling for a follow-up team session.
特别重要的是确保开发人员没有在未首先要求后续的团队会议的情况下引入了主要的设计变更。
After detailing the first of the nine flows, we can immediately turn them over to the design team, and spend time with them to see how well the single flow guides their work.
在详述九个流的第一个之后,我们可以立即将它们转到设计团队,并花时间观察此单个流如何指导工作。
When any team comes to realize that it has been incurring great design debt, the first thing they must do is get control over the withdrawals.
当任意的团队开始意识到,继续取款会招致更大的设计债,那么他们需要做的第一件事情,就是控制取款。
应用推荐