The monitoring of environmental protection check and acceptance of CFB boiler shows that the total desulphurization rate reaches from 93.
通过循环流化床(CFB)废气污染源验收监测,CFB锅炉的总脱硫效率可达93。
The article describes acceptance site inspection procedure which guarantee high quality acceptance monitoring work.
本文详述了验收监测现场勘察的步骤,为高质量完成验收监测工作提供了保证。
In light of realities, the existing problems of acceptance monitoring of this system were found out and some corresponding dealing ways and methods were put forward as well.
并结合实际工作找出做好该系统验收监测工作存在的问题。同时有针对性的提出解决存在问题的方式和方法。