... Adding the modulation frequency of 1 kHz ( 将原100MHz信号加上1kHz之调变信号) Test Levels (测试位准) Coupling Network 耦合网路 ...
基于1个网页-相关网页
Preset IEC standard test levels 预置IEC标准测试水平
High levels of test temperature 高级试验温度水平
levels test 汲取实践
Vocabulary Levels Test 词汇水平测试
levels orthogonal test 水平正交试验
wdinedr vapor levels test 吸水量实践
Advanced test temperature levels 高级试验温度水平
wdined onr vapor levels test 吸水量测验考试
plasma testosterone levels test 血浆睾酮水平测定
Not all test levels approach the above steps in the same manner.
并不是所有的测试水平都以相同的方式来达到以上的步骤的。
These test levels can be coordinated by means of a master test plan (at the project level) and an iteration test plan (at the iteration level).
这些测试级别可以是并列的,这取决于主测试计划(在项目级)和迭代测试计划(在迭代级)。
One needs to consider that the scope of a TMap master test plan, in principle, addresses multiple test levels, whereas in RUP it can also be a single system test.
一个需要考虑TMap主测试计划的范围大体上会有多个测试级别,而在RUP中可以只是单个系统测试。
应用推荐