Combined with the design of Gongboxia Hydropower Station, this paper bring forward some technical problems in respect of proper selection of cable section, earthing mode and protective measures.
结合公伯峡水电站电缆系统设计,对合理选择电缆截面、敷设方式及保护措施等技术问题加以介绍。
A technical and economical comparison was carried out for selection of turbine start-up mode and arrangement of its bypass system of 1 000 MW extra supercritical units in Zouxian Power Plant.
为选择邹县电厂1 000 MW超超临界机组汽轮机的启动方式和旁路系统的配置方式,进行了技术分析和经济比较。
Secondly, in the stage of planning and designing, the method to plan the area, the layout mode of the site, the selection of materials and the temporary technical measures, are researched.
其次是规划设计阶段对场地分区规划方法、场地布局模式、材料的选择与临时性技术措施。