郭婷形成性评价中采用的task-based project(任务型项目学习)就是基于task-..
基于42个网页-相关网页
这种评价主要有问卷调查(学习者和学习行为);访谈(interview)(就某 一专题谈话);任务学习(task-based project)。
基于1个网页-相关网页
task-based project
基于任务的项目
以上为机器翻译结果,长、整句建议使用 人工翻译 。
Yayorin ( www.yayorin.org) is an Indonesian-based conservation project with the mammoth task of teaching its people about conserving the forest and its creatures, with the chief aim being saving existing populations of orangutans.
BBC: Drifting down the Sekonyer
That task has fallen to an unlikely open source project that is based on cryptography protocols and peer-to-peer distributed computing.
FORBES: Bitcoin Prevents Monetary Tyranny
应用推荐
模块上移
模块下移
不移动