Closure cover system is one of important parts of landfill site construction, it includes landfill gas discharge guiding layer, geotechnical film, drainage layer and plant cover surface soil layer.
封场覆盖系统是垃圾卫生填埋场建设的重要组成部分,覆盖系统包括气体导排层、土工膜、排水层、植被表土层。
It is difficult to control the hole and the slope during frozen drill in profundity surface soil, this text bring forward some experience of management and construction.
针对深厚表土层中冻结钻孔存在的钻孔深、偏斜率难控制等施工存在的问题,提出了一些施工与管理的经验。
During normal construction process, the friction force between shield and soil exhibited greater influence on surface deformation compared with bulkhead additive thrust.
在正常施工时,盾壳与土体之间的摩擦力对地面变形的影响远大于正面附加推力。
应用推荐