A coordination scheduling is developed about production scheduling of steelmaking and continuous casting, optimal assignment of steel package and scheduling of crane and dolly.
研发了炼钢-连铸生产调度、钢包优化配备、行车和台车协同调度系统。
The steelmaking-continuous casting scheduling system is developed using virtual reality technique.
采用虚拟现实技术开发了钢铁企业炼钢—连铸调度计划的调度系统。
According to the analysis of dynamic scheduling for steelmaking-continuous casting process, a dynamic scheduling model based on just-in-time principle is formulated.
通过对炼钢-连铸生产动态调度问题的分析,建立了基于准时制思想的炼钢-连铸生产动态调度模型。
应用推荐