According to fatigue damage accumulation theory, test load of verified fatigue test on rail across beam and welded connections with integral joint of combined steel truss bridge was gotten.
依据疲劳损伤累积理论,确定了公轨两用钢桁桥轨道横梁与整体节点连接头验证性疲劳试验的试验荷载。
Measured results indicate that the bend deformation and abruption phenomenon appears very quickly when the "two-bridge-junction" method is adopted in the parallel steel plate beam.
实测资料表明,上下行并行的钢板梁桥在采用“两桥连接”加固以后,平联杆件的弯曲变形和断裂现象急剧增多。
Harbin sifangtai bridge is a cable-stayed bridge whose girder is composed by steel i-beam above and concrete deck slab below.
作为叠合梁斜拉桥,四方台大桥的主梁由下部的工字钢和上部的混凝土行车道板组合而成。
应用推荐