The average time reported for "using" each application every day added up to a total of 15.9 hours, much longer than the standard 8-hour work day.
每个应用每天的平均使用时间加起来就到15.9个小时,这比每天8小时的标准工作时间要长多了。
But the SAX techniques are quite standard, and quite good for stream-oriented processing; much of the time SAX is just the right level to work with.
但SAX技术非常标准,对面向流的处理也非常好;大多数情况下SAX的级别正合适。
Based on the content analysis of assembly line planning, a method for assembly line planning based on standard work time and simulation is proposed, and a corresponding prototype system developed.
在分析装配线规划内容的基础之上,提出了基于标准作业时间及系统仿真的装配线规划方法并开发了相应的原型系统。
应用推荐