Taking as an example the first contract stage road construction of the West Binghe Road of Taiyuan, Shanxi, the paper analyzes ways to control the quality of the surface of asphalt concrete.
以山西省太原市滨河西路南延工程路面施工工程为例,就如何控制沥青混凝料面层现场质量进行分析论述。
The road crew needed more than 24 hours to move and rebuild the stage after a concert.
勤务组在每一场音乐会结束后需要 24个小时以上的时间搬运和重搭舞台。
Although the project is still at the simulator stage, it has already shown that one car in a group driving along a road will have to be nominated as co-ordinator.
虽然这个项目还处在模拟阶段,但是它已经显示出,在沿路行驶的车群中有一辆车必须扮演协调者的角色。
应用推荐