This paper adopted option game method to explore the construction cost of two - stage concession term decision model of infrastructure BOT project and concession term decision.
本文采用期权博弈方法就二阶段基础设施BOT项目的建设成本和特许权期的决策问题进行了研究。
For the construction process of twice prestressed continuous beam, the stress analysis and deformation analysis method during construction stage is provided in this paper.
根据二次预应力连续梁的施工过程,提出了施工阶段的应力和变形分析方法。
Three dimension finite element method is used to calculate the stress state of the cantilever during each construction stage.
因此对桥悬臂施工过程进行了三维有限元计算,分析了各个施工阶段的应力状态。
应用推荐