For the construction process of twice prestressed continuous beam, the stress analysis and deformation analysis method during construction stage is provided in this paper.
根据二次预应力连续梁的施工过程,提出了施工阶段的应力和变形分析方法。
The collapse behavior is divided into three stages and a brief summarize of available analysis method in respect to every response stage.
将海洋平台结构的破坏过程按照不同的特征划分了三个阶段,针对每一阶段的特征以及相应的分析方法进行了综述。
In this paper, it was analyzed and discussed the fuzzy set analysis method used to calculate stage and limiting water level at each stage in flood-peroid.
本文用模糊集合分析法对陆浑水库的汛期分期及各分期的限制水位推求进行了分析和探讨。
应用推荐