Unload and unloading zones of high rock slope are familiar phenomenon in southwest area of China, which influence stability of rock slope and other rock-engineering problem.
边坡卸荷及其卸荷带是西南地区高边坡一种常见的现象,对岩石边坡稳定性及其它岩石工程问题有重要的影响。
Wall cutting and unloading is a task of top priority of comprehensive harness in the north slope of Jinduicheng open pit stope. The vibration by blasting influenced the stability of slope.
削坡减载是露天采场北部边帮综合治理的当务之急,在边坡上进行爆破作业产生震动,对边坡稳定有一定影响。
Taking the influence of blasting loosening and unloading into account, the feedback analysis model of the high rock slope stability is established.
建立了岩石高边坡分步开挖稳定性反馈分析模型,分析过程中考虑了岩体爆破松动及卸荷的影响。
应用推荐