Based on a typical single tower cable-stayed bridge, this thesis analyses the stress distribution of anchorage zones and lower tower using the finite element software ANSYS.
本文利用大型通用有限元软件ANSYS对一典型独塔斜拉桥的锚固区及下塔柱做了详细的有限元分析,考察其应力分布情况。
参考来源 - 箱形截面索塔锚固区及下塔柱应力分析研究·2,447,543篇论文数据,部分数据来源于NoteExpress
It is the first time for movable scaffolding equipment to be used in the construction of main girder of Gonghe cable-stayed bridge which is a single stay surface, single tower cable-stayed bridge.
这是首次使用移动模架在建设共和斜拉桥主梁,这是一个单一的住宿表面,单塔斜拉桥的桥。
It is believed that the crossing will form the world's longest single-tower, asymmetric cable-stayed bridge.
据说,它将成为世界上最长的单塔不对称斜拉桥。
Being asymmetric, it's more complex to determine the reasonable finished state and the reasonable construction state of the asymmetric cable-stayed bridge with single tower.
独塔不对称斜拉桥由于其不对称性,使得其合理成桥状态和合理施工状态的确定显得更为复杂。
应用推荐