MOP 模型基本上 是单目标规划(Single Objective Programming, SOP)之扩充,其不同处在于MOP 可同时处 理二个或二个以上的目标。两者的差异可归纳以下几点:1.
基于6个网页-相关网页
Basing on the trait of United Logistics and the principle of min-cost, a single-objective linear programming model (SLPM) for the ammunition transportation problem is presented.
结合联勤体制下我军弹药调运的特点,基于最低运费的原则,建立了弹药运输问题的单目标线性规划模型,并通过表上作业法求解了实际算例。
Linear programming with fuzzy-numbered Cost Coefficients, include of Single-objective and Multi-objective problems, is a important content in fuzzy decision makings.
目标中含有模糊系数的线性规划,是模糊决策的一个重要内容。
Secondly, multi-objective optimization problem is reformulated into a nonlinear single-objective programming problem by means of fuzzy satisfaction-maximizing method.
采用最大模糊满意度法将多目标优化问题转化为单目标非线性规划问题;
应用推荐