With the in depth going of the electricity market the short term generation scheduling has become more and more important.
随着电力市场的不断深入,系统的有功优化调度在电力系统运行中占有越来越重要的地位。
Load dispatch is the main problem of short-term generation scheduling in power market.
负荷分配是编制短期发电计划所面临的主要问题。
The quadratic programming method is used to solve the short-term power generation scheduling problem under the condition of electricity market and considering the ramp constraints of generating sets.
文中以二次规划算法解决了电力市场环境下考虑爬坡约束的短期发电计划的制定问题。
应用推荐