The characteristic line method is used to simulate the characteristics of the water conveyance system of the ship lock in the Three-Gorges Project.
利用等时段的特征线法数值模拟三峡永久船闸输水系统不补水工况下的输水特性,得出了输水管道沿程各节点水头及流量的变化规律。
Ship lock was one of the main engineering projects of the Three Gorges project.
三峡船闸是三峡工程的主要工程之一。
The paper has analyzed the rock deformation monitoring result of the double-line five-grade ship lock middle-isolated pier in Three Gorges Project.
本文对三峡双线五级船闸中隔墩岩体变形监测资料进行了分析。
应用推荐