Finally, a processing method of shear wall core while adopting the high-lever story isolation technology is proposed which can provide a reference for similar engineering structures.
最后还提出采用高位层间隔震技术时电梯井的处理方法,可供相关工程设计参考。
The final failure mode of the model is tension failure of perimeter columns and bottom of core wall on the tension side caused by overturning moment, and the story shear failure mode was not found.
结构未发生层剪切破坏,最终破坏模式是在倾覆力矩作用下底部核心筒受拉墙肢及受拉侧外框柱拉断。
By use of the uniformization technique, a continuous computational model is developed for the analysis of frame-shear wall-thin walled core skew combined structures.
采用沿高度方向连续化的方法,建立了框架-剪力墙-薄壁筒斜交结构协同分析的连续化计算模型。
应用推荐